Preprocessing for Cost Reduction and Efficiency Enhancement: Integrated Depolymerization Equipment Solution for Powder Dryers
Release time:
2026-04-27 08:26
Source:
The level of pre-processing of solid-state battery raw materials directly determines the efficiency of subsequent processes and the quality of the final product. In conventional processes, “ Dry - Depolymerization - Segmented handling ” This mode easily leads to secondary contamination of the powder and poor consistency. Honeycomb Mill Through full-process integrated design, it will Powder dryer with Depolymerization equipment Perfect integration has been achieved, enabling fully continuous processing. From the feed of raw material in the filter cake state to final product packaging, it takes only 30-50 seconds, significantly shortening the production cycle.

Its core value lies in all-round optimization: first, the negative-pressure air-sweeping system achieves up to 3t/h its moisture-evaporation capability ensures that the powder’s activity is not lost; secondly, precise particle-size control technology enables D50 Coverage 0.1–10 μm The range accommodates the diverse material requirements of solid-state batteries. From an economic perspective, the蜂巢磨 demonstrates significant advantages, with a reduced equipment footprint. 50% , reduced labor costs 60% This results in annual energy-cost savings exceeding RMB 1 million. Such a high-efficiency, low-cost, and highly consistent pre-processing solution has become an effective approach for new-energy-materials companies to upgrade their production lines with intelligent technologies and achieve cost reduction and efficiency gains.

Related News
Business Phone
+86 138 2928 8535 Ms. Emily Shan
+86 159 7313 1827 Ms. Vivian Yang
-
Mailbox: wan.rong@wrmill.com
-
- Changsha Office Address:
-
No. 501, Building C1, DreamWorks, No. 1 Lantian North Road, Xingsha Industrial Base, Changsha Economic Development Zone
Yueyang factory address:
-
On Hunan Construction Machinery Supporting Industrial Park, South Side of Shuetang Road, Bishi Town, Miluo City, Yueyang City
-
Yuan standard factory building 5 buildings
WeChat Ms. Emily Shan
WeChat Ms. Vivian Yang